Pages Menu
TwitterRssFacebook
Categories Menu

Kitchen Cabinet Purchase Agreement

Summary of kitchen cabinets:o Face frame with unfinished open doors and drawers with modified folded “Rockridge” (as defined in the design document)o Cabinet boxes are made of 3/4″ (9-lagig) prefabricated maple wood, where the cabinets are hidden by a fixed door and ” (9-lagig) in plywood, where the interior closets are visible by glass door panels. The faceframes are poplar. The cabinets will have hidden Blumotion hinges and soft Blumotion narrow shock absorbers installed on top of each case. Three shelves will be contained in each cabinet and all shelves are adjustable with a mobile pen systemo doors and drawer trays are solid hardwood boxes of Mapleo drawers are installed in solid nested maple with an imperial finish and with soft blumotion sheets of invisible extension corded saupe. All drawer floors are built with 1/4″ plywood and have a static weight class of 75 lbs with the exception of 3 oversized drawers that have 1/2″ plywood floors and a static weight class of 110 lbs.o interiors on the sink, sink, blind corner downstairs, refrigerator, and all non-glass shells will be provided by quality maple finish (before delivery). o The cabinets with glass front doors have color quality color interior of color plywood ready for primer and finish varnish Whole set of design documents mentioned above until January 16, 2011 and complete all design activities and documents and be mutually agreed with the owners on February 6, 2011. Manufacturing and installation schedule to be developed on the basis of a consensual schedule between the owner and – with the delivery of storage at the site on April 30, 2011 or before April 30, 2011. I recommend you get as much detail as possible in your contract, and if possible, the consequences for missed delivery times – contracts are not for times when everything is going well. Let them protect you if they don`t. I had a scammer for a contractor who seemed cute and friendly and helpful, I paid half before for cabinets and other work and materials, and all he did was demolish my old kitchen (and most likely sell for even more profit). Then I found out that he had been prosecuted 15 times.

In the past, he had sometimes been responsible only for cabinets and had sometimes simply never delivered, whereas he sometimes supplied cabinets to lower specifications than promised. Check in addition to a contract, make sure they are suing your contractor and your table business, are you looking for the company`s founding documents (Will your supplier continue to turn the page? Or bouncing checks to the state? If so, there is probably a reason) and Better Business Bureau. Also make sure that the name of the company in the contract matches the name of the company or the state-registered DBA name and that you are both all pages of a multi-page contract. It requires less than 1/3 in advance. He verbally described all the construction specifications, and I checked with other taxis he made. But my husband will not give him money until he signs an agreement. I don`t disagree with him, it`s a lot of money, but like you, I think I`m naturally pretty confident. Thank you for your comments. I hope you liked your model door! 12.

Google+